The shop floor asks. Your own manual answers.

Bottega answers colleagues from the procedures you've already written, and marks the exact sentence each answer comes from.

Demo with an invented company, no sign-up.
BottegaPlastiche Olona S.r.l. AskLive

Incoming 4

Omar, B shift

Hi Chiara, it's Omar from B shift. Tomorrow morning part 4471 in PA66 GF30 starts on press 5 and Gianni is on holiday until Monday. How do I dry it before moulding? What temperature and for how long? The bag has been open for two days.

  • Alarm E-217 on press 3Ivan, night shift
  • Batch arrived without a certificateIlaria, stores
  • The company laptop on holidayFederica, purchasing
Plastiche Olona S.r.l.Essiccazione dei granuli PA66 GF30
Cod.
IO-ST-07
Rev.
3
Resp.
Gianni Brambilla

Perché si essicca

Il PA66 caricato vetro assorbe l'umidità dell'aria, anche dal sacco chiuso.

Stampato umido dà pezzi con argentature, bolle e resistenza più bassa, anche quando a vista sembrano buoni.

Parametri

Il PA66 GF30 si essicca nel deumidificatore a 80 °C per almeno 4 ore.

Non superate le 10 ore a temperatura: oltre, il materiale ingiallisce.

Il punto di rugiada dell'essiccatore deve essere a -30 °C o più basso.

Per i sacchi aperti da più di un giorno contate 6 ore invece di 4.

Controllo prima di stampare

  1. Prelevate un campione dalla tramoggia della pressa, non dall'essiccatore.
  2. Misurate l'umidità con la termobilancia del laboratorio.
  3. L'umidità residua deve essere sotto lo 0,20%.
  4. Se è sopra, lasciate essiccare altre 2 ore e ripetete la misura.
  5. Scrivete il valore sul foglio di lavorazione con l'ora della misura.

Fermi e materiale avanzato

Se la pressa resta ferma più di 2 ore, il materiale nella tramoggia va riportato nell'essiccatore per almeno 1 ora.

Il materiale avanzato a fine lotto torna nel sacco chiuso con l'etichetta del lotto e la data.

Non mescolate mai lotti diversi nella stessa tramoggia.

Plastiche Olona S.r.l. is invented. The answer comes from a real AI reading; the manual is in Italian, like the real one.

AI readingReady
  1. Reading the question
  2. Searching the 9 documents
  3. Writing the answer in steps
  4. The software finds the sentences
quoted sentences, looked up in the manual0 of 4
Who can do it
Gianni, Franco, Ivan
Review
up to date, next due in 215 days

The answer, step by step

  1. Load the PA66 GF30 in the dehumidifier at 80 °C, with dew point at -30 °C or lower.
  2. Dry for 6 hours, since the bag has been open more than one day, and do not exceed 10 hours at temperature.
  3. Take a sample from the press hopper, not from the dryer.
  4. Measure moisture with the laboratory moisture balance and check it is below 0,20%.
  5. If it is above, dry 2 more hours and measure again.
and one more step

Every answer carries the sentence it came from.

  1. The AI

    Reads the question as it was written and answers only from your documents, copying the sentences it relies on.

  2. The software

    Looks up every sentence in the document, word for word, and checks the document isn't overdue for review.

  3. You

    Save the answer to the log, or send your colleague a one-page card.

If it isn't written down, it asks whoever knows.

When no document has the answer, Bottega opens a gap and assigns it to the right person, with the questions to answer.

Plastiche Olona S.r.l. / Gaps
Federica, purchasing

Chiara, quick question: at Christmas I'm going to my parents' in Puglia for two weeks. Can I take the company laptop to check my email now and then? Do I need anyone's permission? Federica, purchasing

Searched in the documents
  • IO-ST-03
  • IO-ST-07
  • PR-QA-04
  • PR-QA-02
  • IO-MN-01
  • IS-SIC-01
  • IO-SP-05
  • FAQ-UF-01
  • ORG-01
None of the 9 answers it

To write

New gapUse of company laptops outside the companyMatteo TestaIT (external, Tue and Thu)
What it must say
  • Can a company laptop be taken out of the company and for how long?
  • Who has to authorise taking the laptop away?
  • How should email be accessed from outside the company?
  • What rules apply for keeping the laptop safe while off site?
Due within 10 working days

Franco says it out loud. Bottega writes it down.

The voice note becomes a draft instruction, checked against the rules already in your manual. The person who spoke reads it through before it's published.

Voice note from Franco1 minute, from a phone
Transcribed
Right Chiara, here's how I do the S-114 mould, the hot runner one, so Gabriele can write it down. First of all the mould has to be at 60 degrees, otherwise I don't switch anything on. Then I switch the zones on all together, not one at a time, because otherwise the manifold expands unevenly. Zones 1 to 4 I set at 270, 5 to 8 at 265, the nozzle at 280. I wait twenty minutes for them to settle. In winter zone 6 struggles to heat up: if after twenty minutes it's still under 250 don't force it, check the connector, it's always that, pin 6 oxidises. Oh, heat-resistant gloves whenever you touch the connector, it's hot. If the connector is fine and it still won't heat up, call Davide. That's it, I think. Franco
Plastiche Olona S.r.l.Starting up the hot runner of mould S-114
AI draft
to read through with Franco
  1. Check that the mould is at 60 degrees before switching anything on
  2. Switch all zones on together, not one at a time
  3. Set zones 1 to 4 at 270
  4. Set zones 5 to 8 at 265
  5. Set the nozzle at 280
  6. Wait twenty minutes for the temperatures to settle
  7. If after twenty minutes zone 6 is still under 250, do not force it and check the connector
  8. Check pin 6 of the connector for oxidation
Checked by the software5 of 6
  • At least 3 steps in orderfine
  • Safety warningsfine
  • Who to callfine
  • No point left openfine
  • IS-SIC-01 · Heat-resistant gloves on hot-mould workfine
  • IO-ST-03 · Hot runners: heat up in 50 °C stepsto check

What only one person knows, in red.

Franco retires in 130 days, and he's the only one who can change the mould on press 3 or set up the hot runners.

PersonMould changeHot runnersRobotsAlarmsDryingGoods-inOfficeIT
Franco Ghezziretires in 130 d
Gianni Brambilla
Davide Sala
Ivan Perego
Paolo Riva
Sara Colombo
Matteo Testa
Can do it11143311

Overdue procedures show up straight away.

Whoever owns the document gets a reminder, and an answer that rests on an overdue procedure says so.

  • IO-MN-01Press alarm codes and first actionsDavide Sala115 d overdue
  • IO-ST-03Mould change on press 3Franco Ghezzi65 d overdue
  • PR-QA-02Handling non-conformitiesChiara Mauridue in 15 d
  • IS-SIC-01Safety rules in the moulding shopLaura Fontanadue in 25 d
  • FAQ-UF-01Office FAQSara Colombodue in 94 d
  • PR-QA-04Raw material acceptancePaolo Rivadue in 145 d

A sentence that isn't there stops the answer.

If the AI summarises instead of quoting, the software can't find the sentence and the answer waits for a check.

Quoted by the AIIl PA66 va tenuto 4 ore a 80 gradi.Not in IO-ST-07, section Parametri
In the document · IO-ST-07 · Parametri

Il PA66 GF30 si essicca nel deumidificatore a 80 °C per almeno 4 ore.

To checkThe answer doesn't go out until someone has looked at it.

Every question stays in the log.

Who asked and which document answered: the questions that keep coming back tell you what needs explaining better.

  • What temperature does PA66 GF30 go in the dryer at?Kevin · operator, since September · IO-ST-072/2
  • What does E-211 on the panel mean?Simone · A shift · IO-MN-011/1
  • Can I use a batch that arrived without a certificate?Ilaria · stores · PR-QA-042/2
  • When do I have to request Christmas leave by?Mattia · B shift, since October · FAQ-UF-011/1
  • After the mould change on press 3, how many shots do I scrap?Gabriele · tool room · IO-ST-032/2

Inside, a small system built for this and nothing else.

Open the demo
The Bottega demo: the answer to a shop-floor question with the manual's sentences checkedThe Bottega demo: the answer to a shop-floor question with the manual's sentences checked

Questions we get asked

Where do our procedures end up?

They stay in your company's library. The AI sees the question and the documents it needs to answer it, for that answer only. How the data is handled is put in writing before we start.

What if the AI gets an answer wrong?

Every answer carries the sentences it's based on, and the software looks each one up in the document. If a sentence isn't there, the answer waits until someone has checked it.

Our procedures are old and patchy. Do we need to redo them first?

No, you start from the ones you have, in Word or PDF. The unanswered questions show you what's missing, and whoever knows dictates it.

How do people on the shop floor who don't use a computer ask?

From their phone, writing the way they'd write to a colleague. If you already use a chat at work, the questions can come in from there.

Does it replace our quality system or our ERP?

No, it sits alongside. It reads the procedures where they are and keeps the question log; the quality system stays yours, with its own review rules.

How much does it cost and how long does it take?

It depends on how many documents you have and where they live. In a half-hour call we look at how you work and tell you how we'd build it.

Bring three questions from your shop floor to the call.

The ones you hear every week, plus one of your procedures: we'll show you how Bottega would answer.